If it is a production built home, and the model is still being sold between the qualifying periods (June 2022 – June 2024) then it would be eligible. If you are no longer selling the design during this period then the project would not qualify.
If it is a production built home, and the model is still being sold between the qualifying periods (June 2022 – June 2024) then it would be eligible. If you are no longer selling the design during this period then the project would not qualify.